Iowa finished part quote comparison
Compare two manufacturing routes on the same finished deliverable, including setup, post-processing and inspection.
How it works
Enter a confirmed setup cost and the accepted part cost before and after post-processing for each route. Include shipping and inspection in the entered fixed or unit cost, as applicable. Compare equivalent drawings, tolerances and finished quantities.
Worked example
Twenty parts at $15, $5 finishing and $100 setup cost $500. A route with $240 setup and a $12 finished unit cost gives $480.
Local providers
- American Pattern
- BensonsCNC
- GreenField Custom Fab
- Iowa State CIRAS Prototype Assistance
- University of Northern Iowa Foundry 4.0 Center
Related questions
Prototypes and repeat manufacturing project plan
- Can CIRAS help test materials before a tooling project?
- What do I tell CIRAS before asking for a metal print quote?
- Which Iowa quote is cheaper after finishing 20 pieces?
- Do I ask for one core per final casting in the quote?
- Is powder coating included when GreenField quotes a prototype?
- Do fixture and inspection costs belong in the part price?
- Can I compare an intermediate quote with a finished part?
- Can a printed fitting proof count as an injection mold?
- What material should I put on a sand mold quote?
- Who should quote freight for a printed sand mold?
- Does a fit proof in PLA test the final production finish?
- How do UNI and American Pattern differ when I need a casting?
- What should I request from the Waterloo Foundry 4.0 Center?
- Is the UNI sand printing request handled on its main campus?
- How do I show which prototype face needs machining or inspection?
- Should I ask for dimensions before or after print finishing?